The MB told me that the wooden part of the construction would be much more fun than the concrete and shale struggle for the foundation. He was right: in one morning we proceed to build the main beam right down the middle of the floor, 3 2 by 10 boards nailed together resting on 4 6 by 6 posts. Amazing but by lunchtime there is a main beam and by 5 in the evening a third of the joists are up on the beam. I even manage to do another fall, this time tripping while walking backwards over the compressor. Again I am lucky. The MB shouts: Oh no, not again, as I go down but I jump up right away and shake myself down. I'll check later to see if anything's damaged.
Tomorrow we'll have the major part of the floor joists in place...
No comments:
Post a Comment